PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Metal Decking at Derrick -3 (3rd Floor) Facing East (800x600).jpg Rebar mats for Elev. 4-Stair 2  (3rd floor) Facing West (800x600).jpg Surveying for the underground plumbing Facing North-West (800x600).jpg Installed temporary electrical outler Facing North   (800x600).jpg Installing temporary lighting Facing East (800x600).jpg Installing underground piping Facing South-East (800x600).jpg Leveling the soil for the temporary stairs Facing West (800x600).jpg Underground Storm Sewer between column line A-4 and B-4 Facing South-East (800x600).jpg Verizon Removing the lines Facing East (800x600).jpg
Previous pageNext page Installing temporary lighting Facing East (800x600)
Installing temporary lighting Facing East (800x600)